2021 Capital Projects
The Municipal Services District (MSD) Board of Trustees, at their October 14, 2020 meeting, approved six projects that staff will pursue funding from the Fiscal Year 2021 bond issuance (Chart 1). The Board also approved 11 projects for its member entities, encompassing sidewalks, road projects, stormwater improvements, and safety measures for crosswalk intersections (Chart 2).
Chart 1
Chart 2
White City
HAWK Crossing at 10600 South
High-Intensity Activated CrossWalk signal device will assist people to safely cross the street at 10600 South White City Canal Trail (just east of 700 East) from north to south. This past year an old irrigation line was transformed into a trail from 10600 South to Carnation Drive. The HAWK will connect the trail to the Sandy portion on the south side.
Sego Lily Drive Road Improvement
Between 700 East to 1300 East. Additional budget for 2019 Project between 700 East to 1300 East - add curb, gutter, sidewalk and lighting along the corridor.
Unincorporated Salt Lake County
8425 South Sidewalk - Environmental Document & Sidewalk
In March 2020, Salt Lake County was awarded a Federal Transportation Alternative Program grant (TAP) to build a sidewalk on the north side of 8425 South between 1300 East to 1475 East in the unincorporated area of Salt Lake County. This will be a great addition to Sandy Hills Community Council and the sidewalk will connect to Peruvian Park Elementary. Before design and construction begin, an environmental document will be completed meeting federal funding guidelines.
2008 E Dimple Dell Road
Relocate existing storm drain inlet in the roadway to the south and add new curb and gutter to protect cyclists and pedestrians.
Kearns
5615 S Concrete Repair
Repair curb, park strip and sidewalk on both sides of the street between 4270 West and 4580 West.
Traffic Calming (Various Locations)
Traffic Calming measures including driver feedback, signs and speed bumps.
4700 South Improvement
Kearns Metro Township, West Valley City and Utah Department of Transportation (UDOT) are designing improvements to 4700 South from 4000 West to 5600 West to accommodate future travel demand, improve traffic movement and safety of intersections for vehicles, bicycles and pedestrians throughout the corridor.
Copperton
Master Storm Drain Plan
Funds for a consultant to produce a storm drain master plan for Copperton.
Magna
Design of Storm Water Improvements - 2820 South Sidewalk 7563 West to 7440 West
WFRC TAP Grant - funds for the installation of a sidewalk.
Emigration Canyon
Emigration Canyon Road Widening
Funds to obtain a survey for 30% design and feasibility study on widening in certain locations.
Margarethe Stabilization
Funds for the regrading around Margarethe Lane to stabilize the slope.